Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the deffrence multistory bulding &highrise bulding

Answer Posted / saquib hassan

Multi-story mean more than a single story
High-rise: more than 7 to 10 storeys.😊

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.

1519


what is the construction cost for per cft of multistorryed building in kolkata?

2250


660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need

1621


A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S

1995


Stringer How many cm goes to landind

1758


can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.

2045


What are the RISKS during the project construction?

2283


sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????

2247


I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????

2248


significance of specific surface area of particles?

2252


3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.

2131


What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)

2109


How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.

2250


density of crush sand & crush stone or grit powder

6792


A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.

2249