Answer Posted / saquib hassan
This test is done to determine the initial and final setting times of cement.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
Which is the direction for positive angle?
load combinations how many types for staad design purpose?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
how to tie 10 legged stirrups
Differentiate orthographic and isometric projections?
Why are pull-out tests performed for soil nails?
how much percent are used 20mm,10mm?
five benefits of using standard terminology in the measurement process
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
what is the types of door's wood?