Answer Posted / vivekanand
1.Conducting tests and documentation on all materials
2. NCR and confirmaty reports
3.Calibrations of all equipment , plant & machinery
4. Workmanship
5..Checking geometry of the building
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is factor not to be taken in consideration in mix design?
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
What are the different types of civil engineering?
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
How to find out slope footing concrete
What are the composition of a landfill?
What is need for setting limits?
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
how to convert sand in Cft to Kgs
What is meant by cad?
How many pyramid in egypt?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
How to come 1.54 from dry to wet concrete?