Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why in earthing, the earthing plate is put in vertical
position? and further what is soft coke that is used in
earthing?

Answer Posted / dawa

It will cover more earth surface and as go deeper by deeper soil resistance is also low compared to surface.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is vacuum circuit breaker.define with cause and where be use it device?

1368


WHAT IS IEC? & WHAT IS BENEFIT TO PRODUCT FROM IEC?

2174


How to calculate VA rating for CT or PT or Control Transformer?

2895


explain supply side and demand side energy management with advantages & disadvantages

2189


How to calculate multiplying factor of dc energy meter

1709


there is an alternator 480 k.w, 400v,50hz, 4-wire running on load having leakage alternator body earthed current 38 A. is it within acceptable limit? if yes then give reference if no then how to bring within specified limit

1980


how to calculate single phase motor efficiency ?

2313


What aturn on methods of scr?

1231


A 100 kVA , 400 v/250 kv testing transformer has 8% leakage reactance and resistance on 100 KVA base . A cable has to be tested at 500 kv using the above transformer as a resonant transformer at 50 hz . if the charging current of the cable at 500 kv is 0.4 A find the series inductance required . Assume 2% resistance for the inductor to be used and the connecting leads . Neglect dielectric loss of hte cable . what will be the input voltage to the transformer ?

5367


Why you are switching off arc protection mcb when you are taking shutdown for lv board.

1745


i have been tasked with a design of protection, metering and control(PMC) relay panel extension to accommodate all PMC relays.There is an already existing panel where this one will be built.What are the design aspects for this kind of project? thank you.

2159


how to find Harmonics and types as per the equipemnts

1331


Define what is difference between fuse and breaker?

1230


why the check zone and main zone are used for Busbar Protn. scheem?

2235


we have an energy meter in a capacitor bank panel, So should we consider it's readings as energy consumption on daily basis. (when capacitor bank doesn't have any energy losses)

2488