For REM the settings are dependent or normal?
Answer Posted / adnan
For REM (Repetitive Manufacturing) in SAP PP, the settings are generally dependent on the production process and requirements of the organization. REM is a manufacturing strategy where identical products are produced in large quantities at regular intervals, with a fixed production rate and lead time.
The settings for REM can vary depending on the specific production process and requirements, but some of the key factors to consider when setting up REM include:
Production rate and lead time: The production rate and lead time should be set to meet the demand for the product, while ensuring that production is cost-effective and efficient.
Bill of materials (BOM): The BOM should be accurate and up-to-date, with all components and materials required for the production process.
Work centers and routing: The work centers and routing should be defined to reflect the specific steps and processes involved in the production process.
Capacity planning: Capacity planning should be performed to ensure that the required resources (machines, labor, and materials) are available to meet production demand.
Material requirements planning (MRP): MRP should be set up to ensure that the necessary materials are available when needed for the production process.
In summary, the settings for REM in SAP PP are dependent on the specific production process and requirements of the organization. The settings should be configured to ensure that the production process is cost-effective, efficient, and meets the demand for the product.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Why work scheduling view is required for semi-finished and finished products?
How can I use variable size items?
Consignment matl how will be use
what do you mean by opening periods
Difference between Item categories or what is variable size item or non stock item.
What is meant by payscale structure? How did you configure payscale structure?
What are the basic dates?
How is the processing time calculated in a wc when both labor, machine categories exist?
Different types of consumption based planning.
Difference between different strategy groups.
What is Production scheduling Profile and use of it?
Integration between PP and SD module.
What is Material status and which view of the material master it is available?
Difference between byproduct and co-product.
Explain service level agreements