For REM the settings are dependent or normal?

Answer Posted / adnan

For REM (Repetitive Manufacturing) in SAP PP, the settings are generally dependent on the production process and requirements of the organization. REM is a manufacturing strategy where identical products are produced in large quantities at regular intervals, with a fixed production rate and lead time.

The settings for REM can vary depending on the specific production process and requirements, but some of the key factors to consider when setting up REM include:

Production rate and lead time: The production rate and lead time should be set to meet the demand for the product, while ensuring that production is cost-effective and efficient.

Bill of materials (BOM): The BOM should be accurate and up-to-date, with all components and materials required for the production process.

Work centers and routing: The work centers and routing should be defined to reflect the specific steps and processes involved in the production process.

Capacity planning: Capacity planning should be performed to ensure that the required resources (machines, labor, and materials) are available to meet production demand.

Material requirements planning (MRP): MRP should be set up to ensure that the necessary materials are available when needed for the production process.

In summary, the settings for REM in SAP PP are dependent on the specific production process and requirements of the organization. The settings should be configured to ensure that the production process is cost-effective, efficient, and meets the demand for the product.

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Checkdigit example

1856


Explain why their is need of production version ?

616


list the important tables used in pp.

565


What is the role of an administrator in pa?

622


Explain Kanban.

1118






Both labor and machine categories exist. How would you calculate the process time?

610


How to create PRT master record?

1531


What do we do in the realization phase?

544


What is 'mps' (master production scheduling)?

706


What is the difference between indian and us payroll?

606


What is Schedule Margin key. How floats works in scheduling?

2487


Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN

4313


How do you get the system to update this value from the routing?

592


What is end user training

1557


What is the production process in sap?

540