Answer Posted / adnan
For REM (Repetitive Manufacturing) in SAP PP, the settings are generally dependent on the production process and requirements of the organization. REM is a manufacturing strategy where identical products are produced in large quantities at regular intervals, with a fixed production rate and lead time.
The settings for REM can vary depending on the specific production process and requirements, but some of the key factors to consider when setting up REM include:
Production rate and lead time: The production rate and lead time should be set to meet the demand for the product, while ensuring that production is cost-effective and efficient.
Bill of materials (BOM): The BOM should be accurate and up-to-date, with all components and materials required for the production process.
Work centers and routing: The work centers and routing should be defined to reflect the specific steps and processes involved in the production process.
Capacity planning: Capacity planning should be performed to ensure that the required resources (machines, labor, and materials) are available to meet production demand.
Material requirements planning (MRP): MRP should be set up to ensure that the necessary materials are available when needed for the production process.
In summary, the settings for REM in SAP PP are dependent on the specific production process and requirements of the organization. The settings should be configured to ensure that the production process is cost-effective, efficient, and meets the demand for the product.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Explain what is the need of mrp list if the stock requirement list is already given?
Can we have more than 6 standard values in standard value key?
Can't one material be assigned to more than one operation in a routing?
What is standard order type
In om, how to get the details for a group of employees (ex.) Group of drivers in the organization?
What is MRO area & MRP group & some difference
Explain what is “work center” in sap pp and what is the use of data in work centers?
Define gaps.
Difference between Item categories or what is variable size item or non stock item.
What is planned consumption and unplanned consumption?
Integration between PP and SD module.
How many levels of Flexible Planning are there?
what does SAP business workflow do?
You want to integrate pp with fico. What steps would you take?
Both labor and machine categories exist. How would you calculate the process time?