What are the steps involved in creating a pricing procedure?
Answer Posted / kapil
Configure condition type and assign it calculation schema. Then define schema group for pr. org and schema group for vendor and assign them to pr. org and vendor master data respectively and assign both schema groups to calculation schema in schema determination. Then maintain condition records for required conditions for desired key combination.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Does the consignment stock available for mrp? Why so?
If there is a pipe and you send it to a sub-contractor to be cut in to two or three pieces. How will you map such scenario in sap? Will you create separate material codes for each pipe with different length or what will be your approach?
What is a mrp area?
Why is sap so popular?
The terms planned delivery and gr processing time?
How many stock transport orders available in sap system. And how to configure stock transport orders?
What is the result of goods movement?
Explain the 'valuation area' concept in mm?
What is a physical inventory?
How is scrap material taken care of in sub-contracting?
What big changes does this upgrade bring?
What is the class type?
What are the data in the mm module that are maintained at the company code level?
Suppose we change the price of a material in purchase info record, will it change the price in all purchase orders where material is yet to deliver?
What is split valuation? When is it used?