Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why we use stones in
switchyard?

Answer Posted / ramandeep

There are many points in switchyard which are earthed,so to provide low resistance path,we should have to increase moisture in soil and when there is raining water easily absorbed by earth or soil which increases moisture and provide low resistance path by which fault current easily transfer to ground and the stones which are used at switchyard work as a insulation b/w wet soil and living body or human.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I HAVE A 50A MCCB AS PER DESIGN LINE WIRE CONNECT UPWORD SIDE AND LOAD IS CONNECTED TO DOWNWARD SIDE TO THE MCCB.IF NOW ANY ONE CHANGE SUPPLY & LOAD(WISEVERSA) WHAT HAPPENS ? DOES MCCB OPERATION OR WORKING FUNCTION NORMAL IF YES THAN WHY THERE ARE MARKED LINE & LOAD ON MCCB.

2434


Explain the working of variable frequency transformer?

1212


we have consol make 3 phase servo stabilizer for cnc m/c. while installing the earth neutral voltage is 1.7 volts at stbilizer off condition and when stabilizer get on en voltage reaches 4.8 volts (new earthing is done and neutral is helthy condition all phase to neutral volts 440,442,441 v)why this happen.solution for cause.

7224


How to select, design,size & calculate for 11 KV/33KV/66KV/132KV/220 KV/440 KV circuit breaker for HT side of transformer protection/HT distribution protection?

2810


The electrical energy required to raise the tempreture of a given amount water is 200 kwh. If the heat losses are 20%, the energy required is?

2065


from generating station If 400v LT line length is 1000m how much voltage is drop and how do i calculate it? which cable will be use for this line?

2091


raleigh method

2138


How good are you in resolving the commercial issues to Employer's advantage?

2414


Write the programming software name for LG, SIEMENS,Messung,AB

2093


mccb service sittings be done?

1862


send me all basic electrical question and answers

2967


What is thresh hold value of current?

2243


design a 3 bit synchronous and asynchronous counter using T- flipflop

2066


For the requirement of a furnace of temperature range up to 1200 oC using silicon carbide rods, What is the required rate of transformer needed (please do it with all details)?

2001


In siemens PLC, why do we want to move the data ?

2375