how to calculate the no of cement bags required for 100sqft
of area 12 mm thick plastering in proportion of
1:3,1:4,1:5,1:6?
Answer Posted / anwar
1:4 ratio plastering
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
difference between trapezoidal and pedestal footing and how the load acts on that
How much for the BRC lapping in full yield and half yield < and which table to get it ?
what is the clear cover for shearwall?
What is limit state method and working stress method and ultimate method
Define What is passive earth pressure ?
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
How much percentage of brick bats allowed in CD-75 bricks
Explain what is zoning permit?
What is the usage of zoom command?
How do you calculate reinforcement weight of steel?
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
How to find out kg per Sft ?
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.