What is trigger Point. What are the setting required to trigger one action?
Answer Posted / sarang
a trigger point can be created to generate a new Production order (without material) out of the production order. The trigger point will be created for function “Create order with reference” and in parameters, Reference operation set and order type will be assigned.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are the basic dates?
Overlapping and splitting, where do you assign?
What are the ‘bom categories’ supported by sap?
Where we have to specify the teardown time in one operation?
How many levels of Flexible Planning are there?
What is the use of stock requirement list?
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP
IM GOING TO GO FOR AN INTERVEIW SOON AND I WANT TO KNOW WHAT SAP PP INTERVEIW QUESTIONS ARE LIKE. I DONT HAVE A REALTIME EXPERIENCE THOUGH. ITS MY FIRST TIME
Differentiate ‘variant bom’ from ‘multiple bom’?
Explain why there is need of production version?
Explain the stock requirement list and their uses.
How to create opbject dependencies in a bom for a configurable material?
Two or three Production Orders are there for the same day, and goods are not sufficient and then how to proceed?
How do you get the system to update this value from the routing?
what are the settings needed for variant configuration?