In a company 3/5 of people know shorthand 1/4th know typing
and 1/5 know both. What fraction of people do not know both?
Answer Posted / bidisha pandit
People who do not know both=1- People who know atleast 1.
1-(3/5+1/4-1/5)
=1-(13/20)
=7/20
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
There are three trucks A, B, C. A loads 10 kg/min. B loads 13 1/3 kg/min. C unloads 5 kg/min. If three simultaneously works then what is the time taken to load 2.4 tones?
consider expression 'ab' . what happens when 'a' is divided by 'c' &'b' is multiplied by 'c'.
There are two glasses, one is filled with orange juice and other is filled with apple juice both in equal quantities say 50 50 ml. 50% orange juice is poured in apple juice and than the 50% mixture of orange and apple juice is poured in the glass of orange juice. Now you have to find out how much orange juice is there in apple juice glass and vice-versa.
Find the Next Series Nuumber 21, 463, 687, 238, 1134, ----
two, trains, one from howrah to patna and the other from patna to howrah, start simultaneously. After they meet, the trains reach their destinations after 9 hours and 16 hours respectively. What is the ratio?
An article sold at a profit of 20% if both the c.p & s.p were to be Rs.20/- the profit would be 10% more. What is the c.p of that article?
Why do you want to join gnfc
Find sqrt of 113 up to 3 decimal places.
A ship started from port and moving with I mph and another ship started from L and moving with H mph. At which place these two ships meet ?
A Flight takes off at 2 A.M from northeast direction and travels for 11 hours to reach the destination which is in north west direction.Given the latitude and longitude of source and destination. Find the local time of destination when the flight reaches there?
There are 150 weights .Some are 1 kg weights and some are 2 kg weights. The sum of the weights is 260.is the number of 1kg weights?
A can do a work in 8 days, B can do a work in 7 days, C can do a work in 6 days. A works on the first day, B works on the second day and C on the third day rely. that is they work on alternate days. When will they finish the work.(which day will they finish the work) (7+7/168)
In the series 0, 3, 8, 15,__ What is the next number?
If the ratio of the areas of 2 queres is 2:1, then the ratio of the perimeters of the squares is
Find the next series number 1, 1, 2, 3, 6, 7, 10, 11, ?