Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the main purpose of line PT and bus PT?

Answer Posted / d chatterjee

Line PT is serving the purpose of any control voltage requirements for the system with single incomer feeder but Bus PT is required for more than one incomer for synchro check and Bus differential protection.

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Given a collection of points P in the plane, a 1-set is a point in P that can be separated from the rest by a line; i.e. the point lies on one side of the line while the others lie on the other side. The number of 1-sets of P is denoted by n1(P). The maximum value of n1(P) over all configurations P of 19 points in the plane is 18

2153


The knee point of a current transformer is normally unique and known.So why in the nameplate of a CT they put the minimum value like this Vk> 400v.

1386


WHY EARTHING NOT NEEDED IN BATTERY IN SUBSTATION

1962


Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.

1584


Incoming line 11kv And transformer capacity is 2500kva. Consumption load is 1300A. Then fuse capacity is 11kv line.

1669


if 3400kw slipring motor rotor shorting done and motor started on mv drive ,what will be the rotor shoring current

1698


What is the principle of HIGH SPEED DIRECT DRIVE MOTOR ?

2005


sir please send me iocl written test paper in my e-mail account. i'll be obliged to you........ thank u roshan

2205


some time we open engine breaker 8.0 MW load but plant not trip. and another time engine open 4.0 MW load engine trip why? individually engine breaker open & individually emergency stop why difference?

1751


what is mean by drives?

2007


what is cathodic protaction?

1987


What is the problem of internal failure in ship engine telegraph system norcontrol?

2389


how electrical earthing maintenance done in industry?

1610


what are the advantages and disadvantages of speed control of 3 phase induction motor by varying frequency explain with drawing

2665


How to decide the size of the capacitor for a single phase induction motor say 2 HP ??

2220