Answer Posted / v s senthilkumar
0.4x0.2x0.2=0.016
1/0.016=62.5 nos
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
how to calculate MR 9(derivation)
How much 1 cum of M15, M20 & M25 concrete weigh?
what is civil engineer greatest strength and weakness?
What is structural frames or systems?
what is civil enginnering & what you need of this course?
what are the five benefits of using standard terminology in the measurement process?
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
what is the anchorage length of reinforcement.
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
What are the materials used in building a gravity dam?
What is absolute coordinates?