in a mix if desired concrete slump is not obtained , the adjustment of each concrete slump difference is made by adjusting water by which percentage
Answer Posted / kailash sankhala
1% adjustment in w/c ratio, cement content
2% adjustment in aggregate content if desired slump is not obtained
| Is This Answer Correct ? | 11 Yes | 1 No |
Post New Answer View All Answers
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
what is thumb rule for calculating the size of ISMB required for a particular length of span
What is a projection line?
How many litres of water used for curing of 1000sqft of slav
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
How to arrive dry volume of concrete (1.52 to 1.57) ?
How to calculate Volume of Wet cement concrete for a specific grade?
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
can i get hindi version of is codes based on civil engineering?
what is the difference between prime coat and tack coat in road construction
How many are the types of joints?
Howmuch bend to be provide for 200/600 BEEM
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit