Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

15mm thick plastering 1:4 what is the cement consumption per sqm

Answer Posted / ashwani vashisth

cement consumption is 5.70 kg/sqm and sand consumption is 0.56 cft

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Forces in a Shear Wall are in plane or out of plane ?

1126


why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?

3188


Define What is the tallest man made structure in the world?

1245


What is the density of DLC & PQC and how it is differ from normal concrete?

3721


1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.

3298


The mixture of different ingredients of cement is burnt at?

1627


How to find the cuplock pipe qty in staging for Minor bridge?

1673


What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.

2147


Wat is meant by Aecron brick?

2058


Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.

2245


the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

2348


What does civil engineering mean?

1075


Whats the meanig of ,'K' VALUE in the case of soil.....

1987


by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)

2149


Explain what is progress payment?

1144