what is mcArther pile?
Answer Posted / akshay ramesh
A patented pile formed by driving a steel shell into the ground to the required depth, putting in small quantities of concrete, and hammering them down so as to force the concrete into the earth beyond the point of the shell; thus enlarging the end and greatly increasing the bearing area, is called mac-arthur piles. The shell is afterward withdrawn gradually, as the hole that it made is filled with concrete. If the shell were left in, the method would be far more satisfactory; as the shaft of the pile is liable to be seriously imperfect. Same as pedestal pile.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
What is the material consumption- cement,sand,tiles etc for Toilet dado?
What is a hatch patterns?
In which code the the maximum height of concrete casting has been explained
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
I need to constructive work in amaraj batteries
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
What is 1/8 on the architect ruler denotes?
How to determine thee cut length for steel reinforcement bars in R.C.C design
if the nitrates more than 45mg/l in water lead to disease then what is it called
How to calculate the crank rod in slab
Which is stronger solid steel rod or hollow steel pipe?