Answer Posted / sapsur123
First we understand what is inter and intra stock transport order
Intrastock transport order generally using in between plant to palnt under one compnay code so there is no need billing documents, shipping docs needed according plant location
351 - movement type : with out delivery no billing
If receving plant raised purchase order we need to do goods issue by using movement type 351 movement type
This is used when both plants located in same ground
641 and 101 - two step procedure - with delivery no billing :
Outbound delivery done by supplying plant
Movement type 641 - stock intransit once we done the PGI
101 - done by receving plant done by receving plant after receving stock to there premises
Two material docs are created
647 and 101 - one step procedure
Same like two step but goods issue and and receipt done at a time before reach the material to receving plant
Need to remember two things
If stock is in transit need more time to deliver to destination use two step method
Realtime every organization folow this
Stock in trasit time is less with on day follow one step
For intra or inter we need to do configuration
For intra doc type - UB
Item category - U
Delivery doc type - NL
Remember these while doing config
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How do you display a list of all reservations in the system?
What are the mrp procedures available in mm-cbp (consumption based planning)?
You want to perform quota arrangement. What steps would you take?
What is a 'factory calendar'?
What are the different types of forecast model?
What are the account assignment categories in a purchase order?
How to create movement type?
What is the last step in the procurement cycle?
Name some of the data points provided by purchasing for the materials.
What us purpose of unit of measurement in basic data, sales data, and purchase data. Same thing can be maintained differently at three places.
Can someone please share me the FSD for SAP MM related?? It would be great help and thanks in advance.
If there is a pipe and you send it to a sub-contractor to be cut in to two or three pieces. How will you map such scenario in sap? Will you create separate material codes for each pipe with different length or what will be your approach?
What sap program is used to update or create material master records?
What is 'goods movement'?
Difference between planned delivery time and gr processing time?