Calculate the quantity of concrete for the following.
2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m
length.
Answer Posted / amit kumar sachin
Rcc Volume of 2no. Bulb (without pile rcc)
Formula = π/4 {0.4N(D^2-d^2)(D-d)}
Where d=dia of pile
D=dia of under ream(bulb)
N= no of under ream.
Calculation-
Dia of bulb(D)= 2.5 times of dia of pile
D=2.5×0.30 =0.75m
Rcc volume= π/4 {0.4×2×{(.75)^2-(.30)^2}(.75-.30)
= 0.133 m^3
| Is This Answer Correct ? | 12 Yes | 2 No |
Post New Answer View All Answers
What are the skills required to become an architect?
cement and sand required for one block of size 0.23*0.15*0.46
What quantity of 1.0 m3 bricks required?
whaat is blister in box girder bridge and what is its function..
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
Sir how to find cutting length for footing steel bars in the shape of "u"
What glue is least sticky?
02. a. The diagonal of a 9 cube…………… 1 b. Surface area of 9 cube…………… 1 c. Volume of 1-3 cube …………… 1 d. Compressive area of 6 cube …………… 1 e. Top & Bottom face of a Cylinder/Cube is to be proper leveled to deliver the…………………………..…… properly.
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
silt%= silt volume/ silt+sand volume is this right?
what is diversion?
Define different types of roof systems?
can you give me the details of rate analysis of steel and concrete?