Can we use mov instead of esdv Explain the reason

Answer Posted / elham

Hi
No we must not use MOV instead of ESDV. As you know MOV's are working with power but ESDV's are working with Instrument Air (closing and opening) so in the case of power outage we can't close or open MOV but in the case of IA outage we can adjust ESDV on fail safe mode. so ESDV's that should work on emergency cases always are reliable with IA.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

A valve in series with an orifice plate (DP transmitter), is aligned for constant pressure in the pipeline, if there is an error dx, How to align it in process.

879


How to calibrate an pressure gauge with yantrika test bench?

2380


when a magnet is heated?

1532


please send the sample qustion paper for iocl written test ..

3305


Specific gravity.

1476






How to change dcs card in online. (Dsc is maxdna)

2145


How r the calculation of process line mpm.

4314


In a gas over oil actuator, after the opening/closing of valve, how the gas is vented out? How does the hydraulic/gas circuit function?

1390


how to convert cubic metre per hour to newton cubic metre per hour

1590


What is hp & mp seperator .& what is its working principle ?

1828


We Have Two Field bus Pressure Transmitters of Different Sensor Range (I.E One is of Lower range and Another is of Higher Range).Is same Process Line. My Question is Can i provide Saturation Limit to my field Bus Transmitter as We can provide Saturation current limit to HART Instruments. As During Low Pressure Both Working OK ,But During High Pressure, transmitter with Lower sensor range Goes to Fault mode as Beyond its Sensor Limit it can Measure, So may I provide Saturation point Some where to Suppress This Fault during High Pressure.

1146


What is difference between ESD and PLC please Explain me clearly.

4382


where proximity sensor installed on tank in loading arm application

1795


What is the PLC configuration in Cement industry?

3276


What are continuances of connecting earthing and shield of branch cables (instrument to Junction box), at the same earthing pot provided on JB? Is it ok, or may produce some problem? 

2020