Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to add 2 new fields in a file?
How many ways are there in as400?

Answer Posted / sree

1. Change the DDS PF ie.,
Go to library/ QDDSSRC
and edit the PF , add the fields
And compile the PF using CHGPF Command

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain mdt?

1204


what are the key words you must use when using a subfile?

1239


how does the rpg element work?

1296


what is *place and *auto keyword in prtf ?plz explain

3215


how do I declare a minor?

1208


1. What is bound-by-call and bound-by-reference? 2. Where and why is *Nomain used? 3. What are the difficulties faced by programmers when using service programs? 4. Explain the different ways of parsing and compiling XML in iSeries.

6627


How to call one program from another program in RPG? please help me with the code

1792


what is a rpg?

1248


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

2306


what is an online rpg?

1325


How to handle duplicate error handling in RPG?

2354


How to declare the pull button in AS/400..

2389


what is the difference between do while and do until?

1308


what is the procedure and explain about real time scenario.

2007


What is a record lock error?

1814