Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why dont we get shock while testing for voltage with a line
tester?
How the bulb inside the tester glows while testing with
tester coz we are totaly isolated from earth or we are not
giving close path for the current to flow?

Answer Posted / phaseneutral

Neon line tester has a high value resistor inside. It protecting you from electric shock.
More explanation watch this video
https://youtu.be/FsV9J3XINWQ

Is This Answer Correct ?    3 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what are the difference between PLC and embedded

2087


What is the procedure/activities to be taken to inject the current more than 2000A by using 2000A Loading Transformer?

1952


Single phase and threephase power calculation

2087


What are the types of instrument transformer?

1118


Electromagnetic torque developed by the motor is compared to shaft torque. A less B same C depends on motor design D more

1990


I want to know the 'Test voltage' for Tandelta testing of 3.3 / 6.6 / 11 KV Motors. Please explain

2214


1.ZEBRA conductor(large size) 2.KUNDHA conductor( small size ) 3.panther conductor(very small ) 4.lepard conductor (very very small)

2868


What are the raitings of Mcb,mccb and Acb in detail ??

1558


What is the RME and explain the full form and what is the RME work?

2770


3phase motor can be used as a Prime mover for alternator.

1541


what does vector group Dyn11 tell us? also tell me how will u differentiate between phase lead and phase lag thru this vector group

2028


We have 90mX100m hangar with 16 no.of supporting pillar. It is required to provide power supply on all pillars. what is suggested earthing scheme for hangars.

1940


Is it required to lay 2 runs of GI wires along with armoured cables from one power DB to another Power DB?

1888


how brushed dc motor operating ?

1825


what is the Connected Load (kW) or Contract Demand (kVA)of mahindra nasik plant??