thermal power plants in steam using inlet of turbine.inlet
of turbine pressure and flow is same as boiler feedpump why
not use direct to turbine?
Answer Posted / mayur mukaty
Specific heat of Water and super heated steam is different. turbine design Is so that it give max output with minimal Heat energy. As well Steam turbine Operation is base upon conversation of Thermal energy to Kinetic Energy. So come to point when We Direct put Water in to the turbine is Power consumption is so equally to Turbii Output that why its not fisible. Another thing is that compressibility factor but i did not go on that concern because It too long. term
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor
what does mean by kva rating
what is restricted earth fault explain in details
LAPT working in alternator / generator
our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....
im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much
What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?
How to calculate power press toneage
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
explain how the third harmonic content of the magnetising current affects transformer design
Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
what is the trip circuit supervision in an electrical meaning?
By any way can we increase the B check hours from 300 to 500
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.