What is excitation current and voltage in hydro power plant ?
Answer Posted / powerplant.calculations
Refer following link for information on Excitation, PMG, AVR ,power generation in power plants
https://www.powerplantandcalculations.com/2020/05/pmg-excitation-avr-power-generation.html
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to calculate power press toneage
what does mean by kva rating
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
can dp type level transmitter work in under vaccum condition
procedure of how to generate power in solar plant.
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
By any way can we increase the B check hours from 300 to 500
LAPT working in alternator / generator
How do you consider that you can improve and what assistance do you need to achieve this
why airtel use + 24 volts and other operators use -48 volt
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon