Answer Posted / emmanuel
This is a ratio of penetration of a standard plunger at a standard rate in a soil sample placed in a standard CBR mould to the penetration of the same plunger in a standard material.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
roll of DLC in road constructions
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
how to identify np3 pipe and np4 pipe
Calculation of Pier Cap with tapper area?
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
How to build the floor to ceiling bookcase?
What is made from large rocks, which protects the base of cliffs?
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
how many shuttering material required for 1000 sq.m built up area.
Volume of 25kg putty bag & 40 kg putty bag volume??
What are the different approaches in designing the floors of the service reservoirs?
What is meaning of tlc
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
What is GSB gradation