Answer Posted / roshan
BOM
STPO-HEADER DATA
STKO-ITEM DATA
MAST-MATERIAL LINK WITH THE BOM
STPU-SUBITEM DATA
WORK CETER
CRHD-WC HEADER
ROUTING
PLKO-HEADER MATERIAL DATA
PLPO-OPERATION DATA
PLPH-SUBOPERATION DATA
PROD. ORDER
AFKO-HEADER DATA
AFPO-OPERATION COMPONENT DATA
AUFK-HEADER MATERIAL DATA
AUFM- GOODS MOVEMENT FOR PROD ORDER
RESB-RESERVATION
AFRU-ORDER CONFIRMATION
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How do I default it 41?
define variable cost
What are the basic dates?
Scheduling times can be defined in the material master record by?
Difference between base unit of measure, production unit, order unit
Explain Flexible planning Procedure?
what do you mean by planning time fence
What is time phased Planning?
How do you do capacity planning ?
How to create prt master records?
What is the t-code for changing production order and to display production order?
What is the use of mrp pp evaluations?
What is meant by payscale structure? How did you configure payscale structure?
Mention what is the difference between stock transport order and stock transfer order?
In implementation stage tell some standard scenario before AS-Is & TO-BE