What kind of preventive maintenance are there for AC induction motor?
Answer Posted / sabareeswaran
first recivied line clearance permit, after the shutdown main power supply, motor clean, then body earth checking, remove the terminal box check the connection, and check proper gland, now on the main power, check full load current, any different sound, after cloesd the permit
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
in control panel, how can i measuring the distance between one bus bar to another bus bar. then now only for bus bar. in mpcb and contactor also. that means one mpcb to another mpcb how much distance? how can i calculate that.
What is T’Q and X’Q and X’D ? and what is saturated as well as unsaturated ?
What is the important precuations need tocarried out while working with Electrolite in Battery PM?
how to measure the current by compact digital equipment with dislay which fit inside any equipment
What is the maximum No. of out going mccbs permitted from an LV distribution paqnel? What is the ampere relation between incomer and out going switch gears/mccbs?
WHat is the requirement of installing FAST ACTING EARTH SWITCH in GIS and how is that integrated with protection system. How and when does it operate?
what is the reason for indication of light in the earth lamps of main switchboard.if there is an earth why does one lamp get dim and the other two bright.
does the Trivector Meter of three phase automatically takes care of the low power factor and gives the reading accordigly or it does not take care of the Power factor while giving the readings please explain
what id a dry type transformers and its function ?
What is different between resistance grounding system and resistance earthing system?
What is the real function of reverse power relay in generator panel while syncronising?
please describe the Transformer setting, Motor setting, I/C setting, Tie setting
Please provided formula for calculate the cable size from step up transformer to M.V panel, run overhead aluminum cables, total load is 5mega watt, total length 900 feet.
how can you size an automatic voltage regulator?
I want definition for ABT Meter (Availability Based tariff) ?