How can a screen field that has changed since the last
output operation be detected?
Answer Posted / govind ram
Attach the MDT attribute to the field, to detect whether field has been changed as a result of user input.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is data area and how it is used in rpg program ?
How do u design a physical file, when you have 2 Unique fields like for eg in A student file student ID and student examination no both are unique
what is program status data structure?
How can we know running job is batch or interactive?
what is the necessary keyword needed to scroll subfile records?
How to call one program from another program in RPG? please help me with the code
We have job which is running as batch. It takes atleast 06 hours to complete tht job. But I wanna do tht job with in 3 hours?
How can we override a file during runtime in rpg?
How to define data area in RPG program? In which scenario multi occurrence DS is use in AS400?
When it is desirable to describe files Internally?
how can you display specific subfile page on the screen in unequal subfile?
1. If there are two programs using same file and 2 users are using the file at the same time and what can be done to allow them both to access? 2. How can remove lock from the file for accessing it by both users?
how do I play {insert rpg system here}?
Interviewer asked me write down DDS for load all subfile .can anybody write dds
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.