#include<stdio.h>
main()
{
int a=300,b,c;
if(a>=400)
b=300;
c=200;
printf("\n%d%d",b,c);
Answer Posted / nikita mishra
b= some garbage value
c=200
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
why we are useing plastic under the lean concrete?and whts the advantage?
What are the different theories of failure under static load?
What is gravity flow?
please briefly explain calculating or estimating steel quantity for a RCC column?
What is rate of concrete surface rendering work per sqm
Where is the worlds longest elevator and how long is it?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
Why nautical mile is different from statute mile?
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
crank types
3. What are the disadvantages of your present job, things you do not like about it?
Specific gravity of cement?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.