Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the difference between dropout fuse and horn gap
fuse. how to choose between them

Answer Posted / sachin kumar gupta

I think, it is only constructionly different. Both work and working principle are same.

Is This Answer Correct ?    0 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how we calculate the short circuit capacity of the busbar in LV & HT?

1099


how is capacitor bank look like

2400


What is meant by celling voltage & current in excitor ?

2074


What is power factor why we should maintain the power factor unless what will happen

1904


what is DRP panels?

2133


how to calculate transformer turn primary & secondary side 11kv to 420v

2192


How REF protects transformer alone? explain with diagram.

1536


Why are iron cores in transformers made laminated?

1112


how does an encoder work???

2513


what is W.T?specify the acceptable range?

1959


at which voltage level arcing ground is occurs ??????????

2054


For overhead protection we use which transformer?

2483


What size cable (based on voltage drop) is required to supply a 40 A three phase boiler if the wiring system is 75V single insulated cables installed in non-metallic rigid conduit 56m from the main switchboard? Voltage drop in the consumer's mains is 8V.

1970


i want wipro vlsi placement pattern please send me

1767


i applied for c licence with my one year apperents trainee and i have attaced with A grade contractor company experiance that is for 14 monts experiance this document is sufeicant for c licence? pls tell why they rejected

2241