in third party sales, i don't want to create the customer
invoice,unless vendor invoice is posted.how do we control
it?
Answer Posted / anilreddy
So actually we have a control for that, which is in copy controls B/W OR to F2 there we will have copy billing quantity as F(which means the quantity should be copied from Miro to invoice) and also we have item category in that billing relevance should be F which means w/o Miro system should not allow to create customer invoice
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is item category and how is it determined?
For what do you use customer hierarchies?
How can a company's structure represent by defining and assigning corporate structure elements in r/3 system and what is the purpose of doing that?
Have you worked on interfaces? what are the?
Describe the process flow for a credit memo.
Does sap transportation management come bundled with geographical information systems (gis) capabilities? : transportation management
Plant to plant is handled using mb1b. If stock transfer orders with deliveries are configured, use me27.
Tell me about your EDI/IDOC experience?
What is sap transport domain? : transportation management
In what manner copy control transition can be done?
Hi,In transportation while am creating shipment cost document am getting this error "forward shipment cost items incorrect" kindly any one answer me.thanks in adv
What are the various qualifier option or what are the various import options? : transportation management
Can a sales area belong to different company codes?
What’s forward scheduling and backward scheduling activator? There’s a concept called forward scheduling and backward scheduling logic when you do an availability check whenever your order is created system will check whether it’s forward scheduling or backward scheduling, if it’s fatal we have a concept of how is it working, how is that you created as part of your available promise concept? Whatever that date is being considered as part of the logic, whatever the date that is configured or we maintain the data to say know that system tell to create this output back scheduling
What is a field catalog?