M.C.Q

Answer Posted / rajnish kumar gupta

optional

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why we create short columns under grade slab?

1949


what is the most suitable foundation when construct a bird watching tower in a marshy land

1502


1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.

1908


how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation

1339


what is the function of GSB all class ?

783






what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.

2241


How many types of slabs are there & how to design it?

889


How much is the cover for slab?

847


what is raft foundation

1240


What is labor and material payment bond?

719


i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?

11648


Calculation of curtain wall of box culvert

5494


How to arrive dry volume of concrete (1.52 to 1.57) ?

1989


Which code is used for tor & tmt steel bar?

837


What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?

1447