while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
what is the criteria for the finalisation of pavement thickness in road project?
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
what is w/c ratio in dry lean concrete for m10 mix design
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
which method is used in semi-rigid connection design??
How you can turn off the display for dimension in CAD?
Define What is diversion tunnel in a dam?
What is the diff between cad & cadd?
How much does the leaning tower of pisa lean?
How to make tiles floor step by step procedure?
Define What glue is least sticky?
What is difference between code and standard and specification?
Describe the advantages and disadvantages of using plastic and timber fenders?