In Earth work compaction
How u calculate
How many liters of water required,for compaction of ordinary
soil for one Cu.m.
Answer Posted / bijaya kumar behera
ex; water required for 200 mts road??
ans: volume of earth= 200 x 7 x 0 .2 = 280 cum
% OMC = 7 %
After Soil testing NMC = 5% (achived)
So required mc = 7 - 5 = 2 %
for air evaporation add 1%
2+1 = 3 %
water required in earth volume = 280 x 3 % = 8.4 cum
per cum reqd quantity of water 1000 ltr
so total water reqd = 8.4 x 1000 = 8400 ltr
| Is This Answer Correct ? | 20 Yes | 4 No |
Post New Answer View All Answers
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
at which depth the construction of tunnel is economical from cost and engineering aspect.
how calculate the bearing from two coordinates?
What is the basic difference between OPC
What is difference between limit state and working stress method? How it is applies in building structure.
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
What is the use of water table & Kreb stone for drain
How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?
which formula used for calculate the area of segmental arch?
How will you reduce the concrete flow after mixing the concrete
What is soil enforcement?
How is calculate the cube molt
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?