What is Leastcount of
1. Total station
2. Theodolite
3. Dumpy level
4. Plane Table
Answer Posted / ravi kumar
total station : angle 1" , distance 1mm
theodolite : 20"
dumpy level : 5mm based on levelling staff used
plane table : 1 Dimentional
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
what are the duties of Site Engineer in work site?
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
what is the steel difference between np-2 and np-3 pipes and weight also
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
what post do you prefer to work in this company and why do you think you can serve better in such position?
Scaffolding IS code NO.
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
please send me bhel questions on rupesh.017@rediffmail.com
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
what is raft foundation
What is the difference between shear and tensile strength?
what motivates you to do a good job
how many tonnes equals to one cubic feet?