Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / manimaran.r.
V=1/2*√((a1^2+a2^2))*d
where
a1=area of bottom
a2=area of top
d=d1+d2
NCCCL
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
what is the minimum cement content for M20 & M25 as per is code -456(2000).
what is raft foundation
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
what is BPM in concrete demolition hammers. what is better a higher value or lower
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
How to calculate 1 brss for RCC work
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
PL.tell me about civil engineering questions with answer
Define What are the uses of alloys in daily life and how are alloys made?
What are some facts about concrete?
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in