How to obtain B license from TNEB license board. What is eligibility?
Answer Posted / kalaiyarasi
I have B license and i completed ITI and DEEE. What is eligibility?
| Is This Answer Correct ? | 8 Yes | 1 No |
Post New Answer View All Answers
what is the relation between reactive power and power factor for the what is the limit of reactive power and power factor
If we need4× 50mm sq cable but it's not available so we can pull 4×25mm sq 2cables
Why air circuit breaker off due to power failure?
Explain the method to keep noises low in a control system?
if field breaker of generator is closed prior to its rated speed on a power generating unit. what will be the effect on generator, unit transformer and starting transformer.
In 11/0.414 KV Parralel supply network with Bus tie closed what will be the fault level is it doubled or halved??
what is the difference between oil surge relay and buchholz relay.
we have provided 30 nos. relay contacts in panel.I want to know how do we do the numbering for the relay contacts as per any applicable standards
what is the correct method for the outdoor termination of 19/33 KV HT cable step by step?
what could be the RMS value and average value of a 4 phase sine wave?
What will be the voltage impact on secondary side of two transformers with different vector groups when both voltages are compared.
How to calculate the volumetric capacity of a oxygen & Nitrogen gas Cylinder if pressure is 145 kg/cm2 & water capacity of cylinder is 67 liters.
- two pumps must work with them at the same time but if the first pump start the second pump must delayed for some time to start also , with motor rated power = 90 KW and rated voltage = 380 V and rated power factor = 0.85 lag please draw the power and control circuit for it and determine all circuit components parameters that you use it
What is minimum permicible value of leackage current for LT Panle when applying voltage up to 3 KV for 5 Minuits?
While HT line put on to activate ACB in low tention panel VCB tripping instantly.why it happens