Describe control key utility & also standard key ? how many
fields can be configured for standard value key?
Answer Posted / prakash
1. Control key is basically used in Operations( Routing or Master recipe). With the use of control key u Choose Scheduling,capacities,cost,rework,Automatic GR should be considered for the Operation or not.
2. Standard value key: In Standard there will be 3 parameters defined and if we want to configure seperately we can configure a maximum of 6 parameteres for SVK.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is MRO area & MRP group & some difference
What is the SPRO Path for requirement class and req. type?
Difference between plan cost, Actual cost and target cost.
what are Standard keys
We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
What are the types of master views for production and planning?
what is alternative item group
What is process keys
Suppose the client wants me the vacancy to be displayed on a website as well as ess. How should I do it?
Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?
What are all the 'sub-components' of production orders?
How is time management and payroll is integrated?
What is Individual and collective requirements and differecne between them in MTO scenario?