Sir I am from jntuk R13 regulation......
Is there any chance to leave credits

Answer Posted / n.ramanjaneyulu

No bro there is no chance but u have to add grace marks

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

explain the advantages of total stasion

1804


how to preaper for interview wat they asked in interview give me idea

2275


What is the minimum size of the particles of silt soil?

915


Define a polyline?

795


How you can use different dimension tools in cad? What are the different dimensions available?

764






do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?

1310


What is the snap size in civil and how can we create it?

2390


Why are separation membranes used between concrete pavement slab and sub-base?

926


How much material will consume for following specification water tank (9*7.5*6 feet)?

1703


How to calculate cement and river sand material Qty for waterproofing base coat and finish coat

2014


What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)

1306


What is the meaning of a blue land surveyors flag?

908


how find the cut length of tringular ring and any formula find out the quantity of circular brick work

5858


What is Gsb tollens ?

1628


what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)

1617