Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the difference between TOR & TMT

Answer Posted / nknehru

1.TOR bars are coming under HYSD category and TOR is a brand name - Toristeg Steel Corporation of Luxembourg. TOR usually refers to cold treated bars.
2.TMT bars or Thermo Mechanically Treated bars are coming under HYSD category bars and manufactured by rolling steel wires and then passing them through water. TMT bars have a tough external layer and a soft core inside, which makes TMT bars corrosion –resistant and also increases their weldability.TMT refers to hot treated bars.
3.Round plain steel bars dominated the construction industry till seventies. Thereafter CTD (or TOR Steel) dominated the industry till nineties. Nowadays TMT or hot treated bars are the most popular due to its advantages over CTD (TOR) such as high strength and corrosion resistance

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting

1825


How to hide dimensions in autocad?

1187


If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

1841


Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)

5068


List out some of the common problems that architect have to tackle it?

1089


how we can find sieve #4 is 4.75mm?

2325


what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?

2091


manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.

2090


Pls provide me with the calculation or codes related to de- shuttering of flat slabs

6913


what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.

2615


What will you do if you encounter problems like accidents?

1018


Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.

2399


how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step

2176


What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?

2736


Trapezoidal section footing calculation of Volume & its Area

36308