What is the proportion of M 45 grade of concrete
Answer Posted / hanamareddy maddur
M45 grade of concrete is higher grade .it can be used for heavy structure &its proportion not a fix ,it will be vary on site condition,exposure &material proporties
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What Are The Different Type Of Slump Test Indications?
How can we demolish concrete beams?
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
why we are useing plastic under the lean concrete?and whts the advantage?
pls give me ans to ACT formula cube testing porpuse
Dear Sir I Mahesh C. Bhamre have already given a Exam for Superintendent Officer / Public relation Officer Exam Dharmday Aaukta held at Nashik on Date 29/08/2010. My seat no was 5040247. and my cell no is 9822677994. and my mail Id is - mahesh.bhamre@rediffmail.com So can you pl send me details of result of respective exams. Thanking you in Anticipation.
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
How to come 1.54 from dry to wet concrete?
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
What is thumb rule for deep trench excavation
List out some of the checking’s, done at the completion of construction?
how many litres of enamel paint required for 5000 sft of site??
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?