why we do multiply 1.54 for dry volume of concrete?
Answer Posted / ramya
If wet volume is converted into dry volume then dry volume is raised 54% of wet volume
Hence, dry volume : Wet volume➕ 54%wet
. volume
dry volume : ( 1➕ 0.54 ) wet volume
. dry volume : 1.54 * wet volume
| Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
How many cum of 9.5mm stone in 1 ton ?
about higyway engineering
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
What is the absolute pressure scale?
What is horizon or horizontal mining?
what mean By core Billing
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
Define What is aggregate?
What is meaning of FREE STANDING STAIRCASE ?
What is structural frames or systems?
how i get all type of short type question answer about civil engg
How to make a c++ program that converts any base to base 10?
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.