why we do multiply 1.54 for dry volume of concrete?
Answer Posted / ramya
If wet volume is converted into dry volume then dry volume is raised 54% of wet volume
Hence, dry volume : Wet volume➕ 54%wet
. volume
dry volume : ( 1➕ 0.54 ) wet volume
. dry volume : 1.54 * wet volume
Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
What Are The Different Type Of Slump Test Indications?
Define What is unit weight of normal concrete?
What is the use of extend command?
what is the use of beam end forces while using a staad ? wha they are show
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
what r you reqired for concrete baching plant?
what else we can add rather than admixture in concrete to reduce the cement quantity?
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
Calculation of curtain wall of box culvert
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
what are the types of dimensioning?
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
What black man invented the clothes dryer?