Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why double earthing is required for welding machine &
electrical tools.

Answer Posted / sohaib ahamad

to give low resistance and if one earth is out of
order,second will do the required work of earthing the equipment

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

while doing high potential for 11KV 3 core cable how much leakage current will obtain?, what will be acceptance value?

2885


what is differant beetween overload current and phase current?

2340


how we will deside the high voltage value

1987


HI SIR, AM PREPARING FOR RRB FOR SECTION ENGINEER POST. PLZ SEND ME THE PREVIOUS QUESTION PAPERS AND HELP ME. I HAVE NO ENOUGH TIME MY EXAM DATE IS 22ND JUNE.... MY EMAIL ID IS nalla.amarnath@gmail.com

1933


How to calculate Grid rotor resistance(GRR) losses in slip ring induction motor?

4279


at work we have a 3 phase motor but on testing one phase isnt getting a reading. it runs 24 hours a day all week. stops and starts well no noise or heating. the phase isnt down to earth.is it just a bad meter reading or not? phases one and three came up with a resistance reading of 0.4 but phase 2 couldnt get anything shows up as open circuit.

1664


why T/F winding temp measurement cts are odd secondary current ie,109A/1.2A/1.4A?

1866


How do apply electrical 'c'license......pls advice

1709


I am B.E.electrical engineer having 7 years of experience in Transformer testing upto 315 MVA.I want to khow how I can get the 'Electrical Valuer' License.

2103


what is the mechanical safety of DG ?

2189


what transformer we used normally and upto which kva?

1949


What is meant by vector group

2541


On 400 amp factory load how kvarh capacitors provide

1706


what is earthing.how we make it,describe briefly.

2621


what are the advantages and disadvantages of speed control of 3 phase induction motor by varying frequency explain with drawing

2672