Difference between wbm and gsb in road construction
Answer Posted / vinothkumar
Gsp is the first layer of the road
Wbm is the second layer of the road
Then different from gsp and wbm for gsp is the basement and 40mm aggregate used
Wbm 21 mm metal used
Is This Answer Correct ? | 12 Yes | 2 No |
Post New Answer View All Answers
What is the Null Point of chimney in Power Plant
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
Explain what is change order request?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
What is meaning of FREE STANDING STAIRCASE ?
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
what is the use of water bar in water tank and is this an extra item in estimate?
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
Why we provide hair pin for shed
density of crush sand & crush stone or grit powder
how lap length is increased with increase of Grade of steel?
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700