Answer Posted / surajit mishra
Yes. You can. There is no statutory or technical objection to that. In fact, in almost all substations, the HT panels consisting of HT Breakers and the auxiliary panels for Station Battery Charging panel, Transformer cooling fan control panel etc are mounted on the same floor. Of course, distance has to be maintained.
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
what is a pulse transformer? how rise time of pulse changes when ever the voltage changes?
Can any body tell gulf interview question for experienced electrical engineer ?
i need the curve duty cycle and amper for (150 kva @50% dyty cycle) transformer turn ratio :19 and vin 400
I have been using an 600VA with 0.6 p.f UPS with my desktop which has 450W power supply unit. Can anyone explain how can this happen . Because the output of the UPS is 360W (600*0.6) (<450W)
Hello everyone, somebody knows what is a "surplice power" ? The hole phrase is: "This rating is appropriate for a generator set paralleled with an infinite bus e.g. a national electrical supply network or grid where the generator set is run at 100% load, 24 hours a day, 365 days a year and any surplice power is exported into the grid" Thanks in advance.
what is method for testing CT
Why 1/3 is used in symmetrical components?
What is difference is of VSD,VFD,VSDS, are they the same as the direct current to control dc using above mention
Could u pls tell me the NPCIL electrical engineering interview questions for Executive trainee, and also guide me how to face the interview.
determine two methods to find loose connection in operational electrical system?
TELL ME WHAT IS INDUCTOR AND CAPACITOR WHAT IS IT BASIC OPERATION ANDFUNCTION?
what is the disadvantages of common earthing for AC and DC equipment? (i am talking about inverter control room and inverter duty transformer earthing is common...?)
xfhnchncv?
we are having 110 Kv,250mA Electrostatic precipitators for coal fired boilers. what will be static voltage and current after discharge and what time it will remain before earthing?
According to IEC60034-14, When the vibration monitoring system required for motor Bearing. above which KW, it is required? and for what type of bearing the vibration probe is provided.