can we install LT panel & HT panel in one room?

Answer Posted / surajit mishra

Yes. You can. There is no statutory or technical objection to that. In fact, in almost all substations, the HT panels consisting of HT Breakers and the auxiliary panels for Station Battery Charging panel, Transformer cooling fan control panel etc are mounted on the same floor. Of course, distance has to be maintained.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is a pulse transformer? how rise time of pulse changes when ever the voltage changes?

1492


Can any body tell gulf interview question for experienced electrical engineer ?

1630


i need the curve duty cycle and amper for (150 kva @50% dyty cycle) transformer turn ratio :19 and vin 400

1632


I have been using an 600VA with 0.6 p.f UPS with my desktop which has 450W power supply unit. Can anyone explain how can this happen . Because the output of the UPS is 360W (600*0.6) (<450W)

1677


Hello everyone, somebody knows what is a "surplice power" ? The hole phrase is: "This rating is appropriate for a generator set paralleled with an infinite bus e.g. a national electrical supply network or grid where the generator set is run at 100% load, 24 hours a day, 365 days a year and any surplice power is exported into the grid" Thanks in advance.

1266






what is method for testing CT

1626


Why 1/3 is used in symmetrical components?

1393


What is difference is of VSD,VFD,VSDS, are they the same as the direct current to control dc using above mention

1000


Could u pls tell me the NPCIL electrical engineering interview questions for Executive trainee, and also guide me how to face the interview.

3881


determine two methods to find loose connection in operational electrical system?

1245


TELL ME WHAT IS INDUCTOR AND CAPACITOR WHAT IS IT BASIC OPERATION ANDFUNCTION?

1582


what is the disadvantages of common earthing for AC and DC equipment? (i am talking about inverter control room and inverter duty transformer earthing is common...?)

1189


xfhnchncv?

1416


we are having 110 Kv,250mA Electrostatic precipitators for coal fired boilers. what will be static voltage and current after discharge and what time it will remain before earthing?

1477


According to IEC60034-14, When the vibration monitoring system required for motor Bearing. above which KW, it is required? and for what type of bearing the vibration probe is provided.

3701