what is the ration of the dummy columns which are to be dismantled in reconstruction for laying original columns
Answer Posted / suryanarayana
I think CC(1:5:10) with using 40 mm metal
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how much need sand and cement for 1 cft roof construction?
Are cruise ships built for the transatlantic run?
Minimum concrete cover in slabs, columns, beams, foundation and other st?
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
rimmer in pile foundation
Define What is the distance between railway tracks?
What is a hatch patterns?
What is alternate bid?
what is diffrence between catchment area,watershed and basin?
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building
difference between fc and fc'?
States some of the tool bars used in cad?
can i get civil engineering test papers.......?????
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3