What is the Allowable silt content of sand for construction
purposes?
Answer Posted / shanmuga kirubanandan.t
As per CPWD specfication
not more than 8%
block work =5%
plastering work =5%
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How many lbs are there in a yard?
What is the average density of soil?
What is Density of cement, sand & aggregate ?
What is the difference between chamfer and fillet?
How do you measure water flowing through 300mm diameter pipes?
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
what is the most suitable foundation when construct a bird watching tower in a marshy land
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
mix design procedure for 1:6 cement mortar
what is modular brick and it size
How do you compute the volume of airflow?
How can we convert weight batch to volume batch for m30 mix
how much percent are used 20mm,10mm?
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
What is meaning of tlc