What is the Allowable silt content of sand for construction
purposes?
Answer Posted / shanmuga kirubanandan.t
As per CPWD specfication
not more than 8%
block work =5%
plastering work =5%
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what are the types of design? which type of method is used at what type of design & why?
How can we make a hole in a solid rectangle using solidsworks?
what energized you to complete your course?
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
how to do sudoko puzaals?
What is difference between limit state and working stress method? How it is applies in building structure.
how do you stabilize a waterlogged area in road construction
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
Define What is passive earth pressure ?
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
what is the calculation of raw material for 0.35cum of m-15
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
what are the duties of Site Engineer in work site?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?