Why attemperation is required in HRSG in a combined cycle
power plant?
Answer Posted / santosh dhange
attemparation used to Control the Temperature of Super heater, to work within the design parameter.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is the basic use of power plant in equipment
What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?
what is the meaning of SST300 V56A in SIEMENS turbine
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
What is LB-SR.
what does mean by kva rating
Why superheated are started before I'd and rd fan?
explain how the third harmonic content of the magnetising current affects transformer design
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
How to calculate power press toneage
what is the difference between compensated & normal drum level in boiler drum?
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
what is restricted earth fault explain in details
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
what is the trip circuit supervision in an electrical meaning?