Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is meant by negative sequencing in power
system.explain in detail

Answer Posted / dsaisudheer3772

As my knowledge zero sequence (R0) , positive sequence (R11), negative sequence (R22)
R phase = R0+ R11+R22

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

PLS SEND THE RRB CHENNAI MODEL QUESTION PAPER my email id is ganesan98655@rediffmail.com

2017


If the line voltage is reduced to 75% of its rated value then by what percentage current will reduce ?? 75% 25% 50% no change and why ?

2196


Good morning: I'm looking for some informations about the OLTC or the LTC: I wont to know what the function of the tie-resistor in during the operation of reversing/coarse operation Cordially

2005


Name two low frequency oscillators?

1418


What is resistance of 50meters, 16sq.mm, single core copper cable?

1893


Differentiate between ideal and non-ideal voltage sources?

1086


I NEED RRB APTITUDE QUESTIONS AND MODEL PAPER,PLEASE SEND MY E-MAIL joo28_eee@yahoo.co.in

1925


i completed my DEEE. and i want to electrical c license. how to get it..?

2171


what can be the causes of capacitor start motor having a higher current that its actual

1967


sir i want previous entrance exam papers for written test

2155


what is the condition for YnD11

2556


what are the stresses in circuit breakers ?

2020


i am going to attaned the engineer (disign)iterview at HAL please give me duid line

2283


Explain how you intend to work under pressure to meet up with deadline target?

5226


salam&hi, i need to know about how can i calculate an enough current for the new building before i submit it to the suppliers

2085