I'm diploma civil engineer.
My question is what better after diploma
1- BE/B.TECH
2.EXPERIENCE
Pls.suggest.
Answer Posted / pulavendran
I think better to you joint for b tech.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How does a traffic light signal work ?
Explain soil analysis?
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
How much cement will require for 1Rmt Skirting laying
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
What are the important hardware systems used for cad?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
What is the minimum size of the particles of silt soil?
Tell me about triple point of water.
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
How much quantity of cement,sand,stone used to build 1 cum of cc road??
how statics is different from dynamics
What are the methods of measurement? Describe it shortly