Once the Production order is created, how to change the BOM and routing in that order?
Answer Posted / ajit1983
With reference to Mohamed Ibrahim's answer, after changing the bom/routing, go to production order menu in change mode and choose "read pp master data" then only the new bom/routing will be updated.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the planning horizon?
You want to insert an inspection check point at the end of an operation. How would you do that?
What parameters you maintain in “plant parameters” in configuration?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
Explain what happens to plan after it has been converted into production order?
How to attach a drawing for a material to bom ? Is it possible ?
What is a ‘work center’ in pp?
Explain what is routing in sap pp?
In sap-pp what are the costing parameters?
Explain why their is need of production version ?
We want to report on several status combinations like each order that has the status ‘not deleted’ and ‘not technically completed’. What set up is required?
What is internal payroll process?
What is qualification deficiency? How will you come to know that a person does not have certain skills/qualification?
What is Inspection Points?
What is 'capacity planning'?