Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

A building wall is to be constructed , its 12 ft high and 40 ft long and labour cost per foot is 100 rupees , tell me the total cost of labour for that building work plz explain answer ..I am hurry plz any one give me ans as immediately as possible Thanx

Answer Posted / pritamdebnath

Here , the cost will be charged on the basis of per ft square . Total area covered 40 × 12 = 480 .
As per ft required cost is 100 ,hence for 480 square ft ,total labour costs will be 480 × 100 = 48000 rs

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

whou haat goals do you have in your career

2101


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2398


what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter

2451


How to calculate brick work quantity?? Block work quantity??

2475


what is Brest Wall?

1289


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

2084


what is the difference between replacement of cement by groundnut shell ash

3120


suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?

2019


What is proportion of PCC Grade G?

1998


I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help

2762


what are the Task work of different labour.?

2583


what are RIB slabs explain about it

2607


how to calculate valuation for the old building?

2323


How to get MEP technical,instaaltion & testing data for interview?

2083


what is BPM in concrete demolition hammers. what is better a higher value or lower

2715